CA58Arroyo Seco NewsArroyo Seco Road Storm Damage at Milepost 0.75: County Proposed… 2026-10-29
After the February 13, 2025 atmospheric river, Monterey County staff proposed repairing an Arroyo Seco Road failure near milepost 0.75 as part of a two-site road stabilization package.
CA58Carmel Rancho NewsPoint Lobos Reservation and Shuttle Plan: 100-Space Marathon Flats Parking… 2026-10-29
An October 14 county planning hearing considered Point Lobos timed-entry reservations, a shuttle, and 100 off-site parking spaces at Marathon Flats near Carmel Crossroads; the proposal is not yet an active booking requirement.
CA58Carmel Rancho NewsCarmel Rancho Corridor: $4.55 Million Contract Awarded for 1.5 Miles… 2026-10-29
Monterey County awarded Granite Rock Company a $4.55 million resurfacing contract June 16 for 1.5 miles of Carmel Valley Road between Carmel Rancho Boulevard and Via Petra.
CA58Carmel Valley Village NewsCarmel Valley Road Traffic Report: Volumes Below Limits, But Drivers… 2026-10-29
Monterey County's January 2026 five-year traffic review found monitored daily volumes below adopted thresholds, while segments 5–7 exceeded the percentage-of-time-spent-following threshold.
CA58Carmel Valley Village NewsCarmel Valley Utility Undergrounding: County Accepts $447,072 Credit Transfer and… 2026-10-29
Supervisors accepted $447,072 in transferred Rule 20A credits and directed a narrower Carmel Valley Road power-line undergrounding project between Miramonte and Boronda roads.
CA58Palo Colorado NewsPalo Colorado Road Repair Funding: County Renewed Federal Grant Application… 2026-10-29
On August 25 Monterey County ratified a new federal grant application for long-planned Palo Colorado Road storm repairs after the previous grant opportunity was rescinded.
CA58East Garrison NewsEast Garrison Water Infrastructure: 1,800-Foot Inter-Garrison Pipeline Upgrade in State… 2026-10-28
The Marina Coast Water District filed a 2025 plan for approximately 1,800 feet of new pipeline on Inter-Garrison Road, from Schoonover Road toward East Garrison. The filing alone does not verify that construction is finished.
CA58Chualar NewsChualar Canyon Road: Why Monterey County Planned Replacement of Four… 2026-10-28
A 2024 county environmental study identified four short bridges along Chualar Canyon Road for replacement, with access for emergency vehicles a central concern; completion in 2026 is not verified by the study.
CA58Lonoak NewsLonoak Road Rehabilitation Listed for $450,000 in Monterey County Measure… 2026-10-28
The county's 2026 Measure AA priority list included a $450,000 Lonoak Road blade-lay pavement project. It is a documented budget-planning item, not confirmation that the roadway has been completed.
CA58Vierra Canyon Knolls NewsVierra Canyon Road: Monterey County Approved $1.2 Million Extension of… 2026-10-28
A May 19 county resolution added $1.2 million and approximately 1.1 miles of resurfacing to the Vierra Canyon Road project near State Route 156; funding approval does not prove the work was finished.