2026-10-13
Corcoran News: Caltrans Proposes Sweet Canal Bank and Headwall Repairs at Highway 43 Crossing
Caltrans has filed a 2026 project notice for repair work at the Sweet Canal crossing on State Route 43 near Corcoran.
Choose how to support California58:
Credit / Debit Card via StripeChoose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.
Continue with PayPal Continue with ZelleZelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.
Optional reader support. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.CALIFORNIA58
Roads, transit, rail, aviation, ports and infrastructure across California.
2026-10-13
Caltrans has filed a 2026 project notice for repair work at the Sweet Canal crossing on State Route 43 near Corcoran.
2026-10-13
Coalinga approved an environmental action in September 2026 for an extensive sewer rehabilitation program.
2026-10-13
A pedestrian improvement plan in Calipatria calls for building approximately 1,580 feet of new sidewalk on the west side of Railroad Avenue between Main Street and Date Street.
2026-10-13
Grass Valley began an environmental review in April 2026 for a proposed wireless facility designed to resemble a downtown clock tower.
2026-10-13
Avenal city officials filed a September 2026 environmental notice for an urban cooling project called Oasis Canopy Corridor: Avenal's Greenway.
2026-10-13
Caltrans announced that the Highway 101 pavement rehabilitation project through Buellton would enter a new phase on September 30, 2026, with changes to on- and off-ramp access at State Route 246.
2026-10-13
Brentwood began implementing a traffic-management pilot along American Avenue ahead of the 2026 school year to address congestion and potential conflicts during drop-off and pickup at Adams Middle School and Heritage High School.
2026-10-13
A citywide speed-limit update announced June 11, 2026, changes posted limits along multiple Brentwood corridors. The city based its action on recent engineering and traffic surveys performed under state requirements and said new signs would be installed in the following weeks.
2026-10-13
The City of Colusa approved an environmental and land-use action in April 2026 involving wastewater treatment plant annexation and a proposed Colusa Triple Crown development.
2026-10-13
Summer 2026 brought visible work along U.S. 395 through Bishop, where Caltrans is rebuilding roadway pavement and improving crossings, sidewalks and drainage in multiple downtown work areas.