2026-11-05
Vallejo I-80 Overnight Ramp Closure Rescheduled to November 5 for Trash-Capture Work
Caltrans rescheduled one night of eastbound I-80 Magazine Street ramp work in Vallejo to Nov. 5, 8 p.m.–5 a.m., after a weather cancellation.
Choose how to support California58:
Credit / Debit Card via StripeChoose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.
Continue with PayPal Continue with ZelleZelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.
Optional reader support. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.CALIFORNIA58
Roads, transit, rail, aviation, ports and infrastructure across California.
2026-11-05
Caltrans rescheduled one night of eastbound I-80 Magazine Street ramp work in Vallejo to Nov. 5, 8 p.m.–5 a.m., after a weather cancellation.
2026-11-05
Caltrans extends Sunday–Thursday eastbound Bay Bridge lane restrictions through mid-December. One eastbound lane remains open overnight while crews install the Safe Span platform.
2026-11-05
Northbound El Camino Real between Floribunda and Carmelita will close 7 a.m.–6 p.m. Friday, Nov. 6, for paving. Fairfield Road school pickup/drop-off access will be unavailable.
2026-11-05
The northbound I-280 on-ramp at Skyline Boulevard and Trousdale Drive is scheduled for pothole repairs from 8 a.m. to 4 p.m. Nov. 5 and 6.
2026-11-05
Caltrans reports all girders are in place on the new Santa Maria River bridge in Guadalupe. Separate curb-ramp and sidewalk upgrades continue near Fifth Street and SR-166.
2026-11-05
After Ian Choudri resigned, Joe Stephenshaw became interim chief of California High-Speed Rail. Investigators are scrutinizing consultant travel and billing amid funding pressure.
2026-11-05
Caltrans says San Pedro's Vincent Thomas Bridge will close at 12:01 a.m. Nov. 7 for a 16-month bridge-deck replacement; I-710, I-110, SR-103 and Harry Bridges Boulevard form the main detour network.
2026-11-05
Caltrans plans overnight US-101 Cahuenga Pass lane and connector closures Nov. 9, 12 and 13, with no night closures Nov. 10–11 for Veterans Day.
2026-11-05
Caltrans plans lane, ramp and connector closures on SR-91 across southern Los Angeles County on Nov. 9, 12 and 13, with a Veterans Day pause.
2026-11-05
Caltrans plans to close the eastbound I-8 to northbound SR-67 connector from 10 p.m. Nov. 5 to 5 a.m. Nov. 6 for bridge work; a detour is available.