2026-11-16
Hayward Seeks $137,630 Increase for Wastewater Biogas Treatment Contract
Hayward wants to extend Carbon Supply's wastewater biogas media replacement work through June 2028 and raise the contract ceiling to $457,430.
Choose how to support California58:
Credit / Debit Card via StripeChoose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.
Continue with PayPal Continue with ZelleZelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.
Optional reader support. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.CALIFORNIA58
Roads, transit, rail, aviation, ports and infrastructure across California.
2026-11-16
Hayward wants to extend Carbon Supply's wastewater biogas media replacement work through June 2028 and raise the contract ceiling to $457,430.
2026-11-16
Hayward Public Works recommends a $169,000 bid and $16,900 contingency to rehabilitate 21 sewer manholes, plus a separate budget adjustment.
2026-11-16
Hayward council will consider an $801,832 contract and $80,183 contingency for safer pedestrian crossings near Weekes Park and South Hayward senior services.
2026-11-16
Ahead of wet winter weather, Irvine updated its city emergency-preparedness guidance, including free sandbags, alerts, road closures and reporting rain-related problems.
2026-11-16
Irvine's proposed Crescent development could connect Great Park, the rail station and Spectrum area with roughly 1,150 homes; officials postponed initial design choices until 2027.
2026-11-16
Vallejo police say a woman died and two adults were seriously injured in a November 15 collision near Tennessee and Monterey streets. Possible alcohol impairment remains under investigation.
2026-11-16
Proposed three-year CT&T Concrete Paving maintenance contract is capped at $1.5 million, with optional two-year extensions bringing the ceiling to $2.5 million.
2026-11-16
City Council will consider a $2.29 million contract plus a 10% contingency for Sixth Street road improvements, bringing authorization to $2,515,392.
2026-11-16
The city proposes on-call contracts with three geotechnical consultants for materials testing, soils-related services and special inspections.
2026-11-16
On November 17, Chula Vista Council is scheduled to consider separate North and South region contracts for job-order public works surface improvements.