ADVERTISEMENT
LINKERNOSEO + BUSINESS GROWTH TOOLS
Get found online. Turn inquiries into opportunities.Review your website, SEO visibility and customer follow-up. Live AI calls require separate readiness checks.
Scan My Business — Free →
Support independent California journalism Your contribution helps build and sustain independent community reporting across California.
Support California58

Choose how to support California58:

Credit / Debit Card via Stripe

Choose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.

Continue with PayPal Continue with Zelle

Zelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.

Optional reader support. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.
CALIFORNIA TIME--:--Pacific Time
STATE CAPITAL WEATHERLoading…Sacramento · National Weather Service ACTIVE WEATHER ALERTS--Open California58 alert details →

CALIFORNIA58

Explore California

Roads, transit, rail, aviation, ports and infrastructure across California.

Oct 29, 2026

Creekside Court Traffic Barrier: County Records Trace 2024 Closure and Later Highway 68 Safety Pilot

TAMC records show that Creekside Court was a distinct location in the second phase of the Toro Park traffic experiment: a partial Portola Drive closure installed in September 2024 to deter westbound cut-through traffic. A later 2025 pilot followed; current barrier operation requires confirmation.

Oct 29, 2026

Welby–King City US 101: Regional Safety Study Identifies Five Serious-or-Fatal Truck Crashes and $7.8 Million Proposal

A 2024 AMBAG freight study placed the 2.3-mile US 101 corridor between King City and Welby second among its regional truck-involved injury hot spots, using 2017–2021 crash data. Its $7.8 million acceleration-lane and visibility proposal remains a planning recommendation, not a confirmed construction project.

Oct 29, 2026

Fieldbrook Road Bridge Over Squaw Creek Listed for $112,000 Scour Protection; Construction Funding Is Beyond Current Program

Caltrans' October 2025 Highway Bridge Program schedule lists $112,000 for a standalone scour countermeasure at Humboldt County bridge 04C0203 on Fieldbrook Road near Route 299. Of that, $16,000 was programmed for preliminary engineering in 2025–26; $5,000 right-of-way and $91,000 construction were placed beyond the 2029–30 horizon. This is not a bridge closure.