LOS ANGELES COUNTY — November 5, 2026. Drivers using State Route 91 between Gardena and Cerritos face another round of nighttime work beginning November 9. Caltrans District 7 says the sign rehabilitation project requires temporary lane, interchange and ramp closures across a corridor including parts of Gardena, Compton, Long Beach and Cerritos. The agency will not schedule closures November 10–11 because of the Veterans Day holiday.

Dates and route

Work is planned on Monday November 9, Thursday November 12 and Friday November 13, extending into the next morning. Both eastbound and westbound SR-91 may be reduced to two lanes on portions of the corridor between Vermont Avenue and the Orange County line. Some connectors linking SR-91 with I-110, I-710 and I-605 are listed for temporary nighttime closure, along with local entrances and exits.

Which local streets are affected?

Potential ramp impacts include Alameda Street/Santa Fe Avenue in Compton, Long Beach Boulevard in Long Beach, and accesses around Atlantic Avenue, Cherry Avenue, Paramount Boulevard and other cross streets. Caltrans will use marked detour routes as crews move. The official schedule includes different times for individual ramps, so travelers need to check their exact direction and interchange rather than relying on a single general closure time.

November 11 clarification: a different 91 Freeway closure near Corona was canceled

Caltrans announced the separate Nov. 13–16 eastbound SR-91 55-hour restriction near the 241 Toll Road and Green River Road in Corona would not occur because the drainage-culvert project there finished early. See California58 Corona’s report. That cancellation concerns a different construction job and location; it does not cancel the District 7 Gardena–Cerritos sign rehabilitation and potential overnight ramp restrictions listed in this Los Angeles County article. Check Caltrans QuickMap for the current actual road status.

Purpose and cost

The $34 million project covers roughly 14.7 miles of SR-91, upgrading signs, lighting, guardrails and roadway-side features; Caltrans says completion is planned for summer 2029. Work-zone noise, dust and traffic delays are possible. Published construction windows can change with weather or operational needs.

Source: Caltrans November 4 closure announcement, including the exact lane and ramp times. Check QuickMap for current conditions.

Support independent California journalism Your contribution helps build and sustain independent community reporting across California.
Support California58

Choose how to support California58:

Credit / Debit Card via Stripe

Choose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.

Continue with PayPal Continue with Zelle

Zelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.

Optional reader support. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.

USEFUL SERVICES

Useful services from our ecosystem

AFFILIATED RESOURCE

Travel smarter worldwide

OptionTrip

AI-powered trip planning for journeys in California and around the world.

Explore OptionTrip →

AFFILIATED RESOURCE

Free tax & property tools

TaxesTime

Free preliminary tax and property tools, including the Property Tax Savings Report.

Explore TaxesTime →

AFFILIATED RESOURCE

California document support

LegalDocSVC

Document preparation support for self-represented Californians. Not a law firm and not legal advice.

Explore LegalDocSVC →

WORK WITH CALIFORNIA58

Have a story, project or partnership idea?

California58 welcomes news tips, interviews, video projects, community partnerships, advertising and other California-focused collaborations.

Work with California58 →

COMMUNITY

Comments

Join the California58 conversation. You must be signed in to comment.